V% — Base saturation
Share of the soil's CEC occupied by bases (Ca, Mg, K). Liming raises V% to the level the crop requires; the gap between the current V% and the target defines the lime requirement.
Share of the soil's CEC occupied by bases (Ca, Mg, K). Liming raises V% to the level the crop requires; the gap between the current V% and the target defines the lime requirement.
Talk to Nova Ita's engineering team and get a technical proposal with the right spec for your operation.